NEVI Build-Out Michigan

Michigan NEVI Build-Out

Every NEVI-funded charging site in Michigan, from grant award to first charge. Part of the regional NEVI tracker.

11
Sites tracked
11
Live
0
Under construction
40
Planned ports

Michigan's NEVI pipeline is at an earlier stage — sites here are moving from award to permitting to construction, and expected live dates should be treated as approximate. The pattern matches the program's purpose: corridor gaps with real traffic and thin commercial incentive.

New to the program? Start with NEVI Explained — what the $5 billion program requires (97% uptime, four 150 kW ports minimum), why it paused and restarted in 2025, and how to tell if a station is NEVI-funded.

Michigan Sites

Location Corridor Operator Ports Power Status Expected Live Source
Alma — RED_E 4 150 kW live † 2025-12-11 Source →
Bear Lake — FCN 4 250 kW live † 2026-04-07 Source →
Flint — RED_E 4 150 kW live † 2025-12-11 Source →
Gaylord — FCN 4 150 kW live † 2026-03-03 Source →
Jackson — RED_E 4 150 kW live † 2025-09-26 Source →
Lansing — RIVIAN_ADVENTURE 6 150 kW live † 2024-12-11 Source →
Mackinaw City — RED_E 4 150 kW live † 2026-01-09 Source →
Reed City — RED_E 2 150 kW live † 2026-08-26 Source →
Walker — RED_E 4 150 kW live † 2025-07-18 Source →
Wayland — ChargePoint Network 2 250 kW live † 2026-06-27 Source →
Wayland — ChargePoint Network 2 250 kW live † 2026-06-27 Source →

Data sources and methodology

Site list sourced from state DOT NEVI program pages and FHWA grant records, cross-checked against the NREL Alternative Fuels Station Locator. Status verified monthly. Expected live dates are official estimates and regularly slip 3–12 months. Last data check: November 2026. For scoring methodology across the site, see how we measure. Related: Michigan EV charging hub · Q3 2026 regional status report.

† = station auto-added from NREL's funding_sources: NEVI tag, not editorially verified against state DOT records. Hand-curated entries take precedence.